Section 3 done.
Section 2 and 3 painted inside.
2009-02-11:
Section 2 assembled. Frame for section 3 done.
2009-02-10:
All pieces for the other two section cut and drilled.
2009-02-08:
First section assembled and painted inside.
Start of the assembly of the first section.