måndag 27 juli 2009











2009-07-27:

Setup all the modules and check how the sceenery looked together.

Found an electrical problem in one turnout: one little section of track had lost power.
Solved it by solder a connection between the rail and the connection strip that was suppose to feed the rail. One pointrail became lose during that operation. I might have to replace the whole turnout. Nothing I want to do.

Have done som minor tests by running some trains over all tracks and removed ballast that got stuck in the wrong places.

onsdag 8 juli 2009


2009-03-08:

All track layed.


2009-03-05:

Came to think of that I need to know the sizes of the industry buildings in order to place the industry tracks. So I had to start to build some of the industries.



2009-02-14:


All legs done. The legs was attached to the sections and all sections was bolted together.

The track was layed out to get a feel for how the trackplan would look like.
I later changed my mind and used the trackplan on the top.