2009-07-25:

Ballasting completed on all tracks on section 2.

Some minor additions remains before the module can be assembled again in order to attach the road that crosses the from section 2 to section 1 so the road becomes alligned when crossing from one section to the next.



2009-07-24:


Time to continue with section 2 again. Sand and turf added to areas missing landscape.
A bumper has been added at the end of the teamtrack.

The industrial tracks has got some ballast, but not all of the tracks are done.

måndag 20 juli 2009


2009-07-20:

The work with the ballast on section 3 continues. It has to be done in correct order as the "new" gray ballast on the main is to be on top of the old brown and sand ballast on the industrial spurs.

lördag 18 juli 2009


2009-07-18:

The work is progressing a little slower right now.

Some turf has been added and the first ballast has been added.

söndag 12 juli 2009


2009-07-12:

Painted the sides of the track of section 1.

Ballasted first the industry spur then the main and siding.