The work with the ballast on section 3 continues. It has to be done in correct order as the "new" gray ballast on the main is to be on top of the old brown and sand ballast on the industrial spurs.
lördag 18 juli 2009
2009-07-18:
The work is progressing a little slower right now.
Some turf has been added and the first ballast has been added.
onsdag 15 juli 2009
2009-07-15:
The work on section 3 has continued.
A strip of turf has been glued.
Speakercloth has been glued and painted.
The rails has been painted on the sides.
onsdag 8 juli 2009
2009-03-08:
All track layed.
2009-03-05:
Came to think of that I need to know the sizes of the industry buildings in order to place the industry tracks. So I had to start to build some of the industries.