måndag 20 juli 2009


2009-07-20:

The work with the ballast on section 3 continues. It has to be done in correct order as the "new" gray ballast on the main is to be on top of the old brown and sand ballast on the industrial spurs.

lördag 18 juli 2009


2009-07-18:

The work is progressing a little slower right now.

Some turf has been added and the first ballast has been added.

onsdag 15 juli 2009


2009-07-15:

The work on section 3 has continued.

A strip of turf has been glued.

Speakercloth has been glued and painted.

The rails has been painted on the sides.

söndag 12 juli 2009


2009-07-12:

Painted the sides of the track of section 1.

Ballasted first the industry spur then the main and siding.

lördag 11 juli 2009





2009-07-11:
Friends pointed out that the color of my grass on section 2 wasn't too good.
So I started to do some tests to mix a better color, more looking as grass.
I think I have found it, so I painted the section 1 and repainted section 2.

Section 2 also has the loading dock painted with Polyscale Concrete and the parking lot is glued in place.
It's made of waterproof abrasive paper. The road leading to the station will also be made of that material.

torsdag 9 juli 2009


2009-07-10:

Painted the loadingdock with a first coat of paint. More will be needed though.

The foundation for the station also got some paint.

2009-07-09:

Painted more grass and drybrushed it with yellowish paint.

Added rubbercork as foundation for the parkinglot by the station.


Added a loadingdock by the teamtrack. The ramp need some putty, will add that tonight.