lördag 15 augusti 2009

2009-08-15:
Fixed some electrical problems in a turnout.
Ran some trains.
Some more video: http://www.youtube.com/watch?v=zdLvKpld-1Q

onsdag 12 augusti 2009

2009-08-11:
Not mutch work on the module at the moment.
Did some running instead.
http://www.youtube.com/watch?v=NTKlJUJMFhk

måndag 27 juli 2009











2009-07-27:

Setup all the modules and check how the sceenery looked together.

Found an electrical problem in one turnout: one little section of track had lost power.
Solved it by solder a connection between the rail and the connection strip that was suppose to feed the rail. One pointrail became lose during that operation. I might have to replace the whole turnout. Nothing I want to do.

Have done som minor tests by running some trains over all tracks and removed ballast that got stuck in the wrong places.

2009-07-26:

On section 1 I added asphalt (abbrasive paper) for the runways and turf where scenery was missing.

Placed the buildings on to check that everythinh looked ok.

lördag 25 juli 2009


2009-07-25:

Ballasting completed on all tracks on section 2.

Some minor additions remains before the module can be assembled again in order to attach the road that crosses the from section 2 to section 1 so the road becomes alligned when crossing from one section to the next.



2009-07-24:


Time to continue with section 2 again. Sand and turf added to areas missing landscape.
A bumper has been added at the end of the teamtrack.

The industrial tracks has got some ballast, but not all of the tracks are done.

torsdag 23 juli 2009


2009-07-23:

All ballastwork is done on section 3.

The pavement (abravsive paper) is glued in place.

Some turf and sand still needs to be added.